Gasification and
Pyrolysis Plant List
The
following is a table with Municipal Waste gasification and pyrolysis plants listed, and is
taken from the UK Defra Waste Implementation Programme, published in 2005. It shows plants which were
operational at that time, and some in planning and commissioning stages.
The
development of pyrolysis and gasification technologies for MSW was at that time considered to be in its infancy
in the UK but commercial scale plants were operating as in the table below. Most of those listed were in
operation in Europe, North America and Japan.
Many
other pyrolysis and gasification plants have been constructed and brought into operation since, and yet more
plant using Advanced Thermal Treatment technologies are in construction and planned.
Examples of Advanced Thermal Treatment plant in the UK and
overseas.
Table 4 : ATT Plant (2005)
|
Manufacturer
|
Primary
Technology
|
Country
|
Operational
|
Capacity,
tpa
|
Feed
|
|
Compact Power
|
Tube
Pyrolysis
|
UK -
Avonmouth
|
2001
|
8,000
|
Clinical
Waste
|
|
Energos
|
Grate
Gasification
|
Norway
|
1997
|
10,000
|
Industrial and Paper
Wastes
|
|
Energos
|
Grate
Gasification
|
Norway
|
2000
|
34,000
|
MSW
|
|
Energos
|
Grate
Gasification
|
Norway
|
2001
|
36,000
|
MSW and Industrial
Waste
|
|
Energos
|
Grate
Gasification
|
Norway
|
2002
|
70,000
|
MSW and Industrial
Waste
|
|
Energos
|
Grate
Gasification
|
Norway
|
2002
|
37,000
|
MSW
|
|
Energos
|
Grate
Gasification
|
Germany
|
2002
Commissioning
|
37,000
|
MSW and Industrial
Waste
|
|
Energos
|
Grate
Gasification
|
Germany
|
2005
Commissioning
|
80,000
|
MSW, Commercial,
Industrial
|
|
Energos
|
Grate
Gasification
|
Sweden
|
2005
|
80,000
|
Municipal and
Industrial Waste
|
|
Enerkem/Novera
|
Fluidised Bed
Gasification
|
Spain
|
2002
|
25,000
|
Plastics
|
|
FERCO
|
Fluidised Bed
Gasification
|
USA
|
1997
|
165,000
|
Biomass
|
|
FERCO
|
Fluidised Bed
Gasification
|
UK - Winkleigh
Devon
|
Planning
|
100,000
|
Biomass
|
|
Foster Wheeler
|
|
Finland
|
1998
|
80,000
|
Mix
waste
|
|
GEM
|
Fast (ablative)
Pyrolysis
|
UK -
Bridgend
|
Not yet
operational
|
60,000
|
Pre-sorted
MSW/RDF
|
|
Mitsui Babcock
|
Rotary Kiln
Pyrolysis
|
Japan
|
2000
|
80,000
|
MSW
|
|
Mitsui Babcock
|
Rotary Kiln
Pyrolysis
|
Japan
|
2002
|
150,000
|
MSW
|
|
Mitsui Babcock
|
Rotary Kiln
Pyrolysis
|
Japan
|
2002
|
50,000
|
MSW
|
|
Mitsui Babcock
|
Rotary Kiln
Pyrolysis
|
Japan
|
2003
|
95,000
|
MSW
|
|
Mitsui Babcock
|
Rotary Kiln
Pyrolysis
|
Japan
|
2003
|
75,000
|
MSW
|
|
Mitsui Babcock
|
Rotary Kiln
Pyrolysis
|
Japan
|
2003
|
60,000
|
MSW
|
|
Thermoselect
|
Tube
Pyrolysis
|
Germany
|
1999
|
225,000
|
Domestic and
Industrial Wastes
|
|
Thermoselect
|
Tube
Pyrolysis
|
Japan
|
1999
|
100,000
|
Domestic and
Industrial Wastes
|
|
Thermoselect
|
Tube
Pyrolysis
|
Japan
|
2003
|
50,000
|
Industrial
Wastes
|
|
Techtrade/Wastegen
|
Rotary Kiln
Pyrolysis
|
Germany
|
1984
|
35,000
|
RDF
|
|
Techtrade/Wastegen
|
Rotary Kiln
Pyrolysis
|
Germany
|
2002
|
100,000
|
Domestic and
Industrial Wastes
|
If any of our visitors has information they would like to give us on additional plants please email us the detals
at , for inclusion.
If you wish to keep a copy or to print this list out, download the Acrobat (pdf) version below:
Gasification Plant List
|